Road testing the new shack

Last night and today I’ve been doing a little operating from the new desk. I got the PC installed so I have computer logging. The paper logbook served me well 25 years ago, but time marches on. I like the occasional additional detail recorded in the paper log, but I like the “low friction”, as they say now, of QLog. I’m still learning my way around it.

Since the second monitor was broken and returned, I decided to try operating with a single monitor. After half an hour I decided that a single, 27″ 4K monitor is enough for the time being. I’ll return both of the dual monitor mounts – they suck anyway. I also abandoned the KVM switch I planned to use. I had it in my office to share the keyboard, mouse, and monitors between my work laptop and my personal PC. I was going to install it on the operating desk in case I wanted to connect a mini PC or Raspberry Pi temporarily. I’ll just leave an empty HDMI cable and use it if and when I need it. Way less cabling, less hassle, and I’m finding out that half the stuff I was using for video won’t work with a 4K monitor at 60 Hz. So screw it! I don’t really need it anyway, I’ll just run a single DisplayPort cable from the PC and leave a spare HDMI cable connected in case I need it. Would it be nice to have two screens for logging, web browsing, and all that? Maybe, but it’s not worth the extra hassle.

I ran FT8 last night with the FT-1000 on 40 and 80 meters with moderately good results. I actually worked several European stations on 40 meters, which surprised me a little. This morning I warmed up the SB-101 and have been working POTA stations on 20 meters off and on all day. I like it. The tuning procedure is easy with the LDG switch, and most of them hear me on the first call. I have the three radios on a 4-way passive audio switch, using the SB-600 as the station speaker for everything. That works great too. Switching from one position to another only requires one button push for the speaker switch, and one turn of the antenna switch knob. I can move the desk chair left or right to be in front of whichever rig I’m using, and the desk is deep enough that I can have the keyboard, mouse, straight key (attached to the HW-16), CW paddle, and even a soldering iron on it when needed, without crowding the rigs. Aside from the all concrete environment, this is working out pretty nicely. It’s by far the best ham shack setup I’ve ever had.

Good news, bad news…

The good news: The new shack is coming together, slowly. The equipment is in place and largely cabled,, though I do have a lot of cleanup and organizing to to on the cabling. Right now it’s a rat’s nest behind the equipment and the desk, which I really want to avoid. However, I’ve done some listening and moved a few things around to improve the work flow for the different rigs. I think if this as three separate stations; the FT-1000, the SB-101, and the HW-16. Three operating positions, in different parts of the desk, with different goals.

I also fired up the HW-16 and tested it on 80, 40, and 15 meters. Reverse Beacon Network spotting stations heard me on all three bands, so that’s good.

The bad news: The fancy monitor mount is kind of a piece of crap. Whoever designed it made an incomprehensible decision to use unequal length sections of the arm that raises and lowers the monitors. Since the two arms and their end links/pivots are not parallel, any time you move the monitors the cross bar tilts so the monitors are not level in any position but one. Their response: “Oh, we designed it to be viewed from one place, but you can adjust the arm to level them”. OK, but the monitor attachments won’t hold adjustment either, so every time you move the monitors at all it turns into a circus act of adjustments to get them more or less level. I’m pretty sure I’m going to return it.

I also bought two new 4K monitors from Costco. They arrived today, yippee! Unfortunately, one had a broken seal on the box, a missing power cord, and a cracked screen. Wonderful.

New shack coming together

After a few days of cleaning up the corner of the workshop where I’m setting up the new shack, it was finally ready for the desk. I had an Ikea Galant corner desk set up in my home office – an unused bedroom on the second floor. I figured that by re-configuring that desk I could make one very long desk – about 9 feet long and 31-1/2″ deep, with a short “L” on the left end. I’d rather have had it on the right end, but Ikea discontinued that line years ago and obtaining a new desktop is not practical. I spent most of a day dismantling the desk and moving it to the basement, then most of another day re-assembling it there. I also had to source an additional leg from eBay. This desk is very strong! It’s got a frame made of square steel tubing bolted together, supported by some serious T-shaped legs. The desk top is 3/4″ particleboard, laminated with some wood veneer and stained black. In its final configuration it measures a bit over 110 inches long.

I put a four foot long power strip with 12 outlets on the wall behind the desk for AC power. That should be enough for the radios, shack accessories like the SB-610 station monitor, and the DC power supply for the other accessories like the automatic antenna tuner, Morse keyer, and so on. Then there’s the computer and two monitors (unless I power them from the DC power supply; the jury is out on that).

I have not yet decided where to mount the ground bus bar or DC Powerpole block yet; I’d planned to put them on the particle board panel behind the desk that holds the antenna switch and outlet strip, but I’m leaning toward a different arrangement now. I’ll get the coax switch up today and start the antenna cabling, but I’m sure I’ll need to buy some additional RG-8x jumpers – the longest i have are 3′, and the HW-16 at least will need longer than that. An Amazon shipment is due in today with the audio switch, ceiling hooks, and Velcro straps to get the cabling arranged as neatly as I can.

I bought a dual monitor wall mount arm, but the one I received is defective. Its replacement is due in today, and the two new 27″ 4K monitors should arrive tomorrow. I’ve been using a pair of 24″ HD (1024) monitors for probably more than 10 years, since my second previous employer sent them – they didn’t want them back when I left. They’re still functional but old, so they’ll have a new life with family members who can still use them. I’m glad I kept the original stands.

I need to shorten the antenna coax and get a new connector on the end, and get the PC carried downstairs and installed. That will be a fair amount of cabling, since I want to set up the KVM switch so I can, if needed, plug in something like a Raspberry Pi, a mini PC, or my laptop and use the keyboard, mouse, and monitors. I’ve been using a pair of Altec Lansing computer speakers that I’ve had since the early 90s; they work and sound great, but I may go with something smaller. Most computer speakers now are either way overkill gaming setups with subwoofers, or garbage little pieces of crap. I think I may still have a halfway decent little Dell speaker bar somewhere in my old office, I’ll see if I can find that and figure out a good way to mount it.